Summary
A practical incoming inspection SOP for LED packages: sampling plan, test items, acceptance criteria and records.
Purpose
Incoming inspection verifies that each lot meets the datasheet and internal requirements before production. A usable record must state what the lot is, how many samples were taken, what was tested and why it passed or failed.
Sampling
- Use GB/T 2828.1 or an internal sampling plan
- Define lot size, inspection level and AQL
- Critical defects (dead LED, IR over limit, VF out of range): c = 0
- Small lots may be inspected 100%
Test items
| Item | Method |
|---|---|
| Appearance | Visual / microscope |
| Dimensions | Caliper / projector |
| VF | Rated current, controlled temperature |
| IR | Specified reverse voltage |
| Luminous flux / brightness | Fixed current, warm-up stable |
| Color coordinates | Spectrometer / colorimeter |
Judgment
- Critical item failure → reject or 100% inspection
- Minor items → accept/reject per AQL
- Concession requires risk assessment and approval
- Isolate and retain failed samples
Records
Lot number, sampling plan, test conditions, measured data, judgment, inspector and reviewer.
Common mistakes
- No lot number or sampling plan
- No measured data, only pass/fail
- Test conditions missing
- Same conditions for all package types
- Failed samples not isolated
Need an inspection template or tester? Contact our engineers with your package and lot size.
Need a test solution?
Tell us your LED package, test items and daily capacity. Our engineers will recommend a configuration.